© InterEnergy. All rights reserved.
Generation: Wind
Start of operation:
Rosario: 2015
María Luz: 2016
Villa Rodriguez: 2017
Installed capacity: 40 MW
Location: Office’s address: María Luz, Villa Rodríguez, and Rosario, Uruguay
“We are proud to enter a leading country in wind power in Latin America,through an operation that positions us as a leading group in renewable energy generation in the region,” stated Rolando González Bunster, Chairman and CEO of InterEnergy Group. With a solid tradition in the renewables market, Uruguay provides a security framework for the investor.